How to choose a B2B portal: start with the work, not the features
Knowing how to choose a B2B portal comes down to five decisions taken in order: what your ERP can expose, which commercial rules the portal must enforce, who may see what, what the first release contains, and how you will compare suppliers against one written brief. All five can be settled before a developer or platform vendor is in the room. Portal projects that disappoint usually start the other way round: someone sees a demo, likes the screens, and only later finds that the pricing rules, the ERP connection or the supplier paperwork were never pinned down.
Start once you have picked one user group: dealers, customers or suppliers. If you are still deciding whether a portal pays off at all, start with what a B2B portal for manufacturers is and when it pays off.
Step 1: find out what your ERP can actually give you
Everything useful in a portal comes from somewhere else: prices, stock, credit position, order status, payment status. Before you look at a single product, find out what your ERP or accounting system can expose, who maintains that connection and how fresh the data can be.
Most current systems publish an interface. TallyPrime's integration documentation, for example, lists XML as supported natively, with JSON and ODBC available through TDL customisation. That is encouraging, but "it has an API" and "it exposes the price list per dealer tier and the credit balance in real time" are different statements. Ask your ERP vendor or administrator for the list of items that can be read and written, and note anything that today lives only in spreadsheets. That list decides how much of the project is integration and how much is data clean-up.
A data-readiness check you can run in an afternoon
Pull a sample of 20 products and 5 dealer or supplier accounts from the ERP and check them against this list:
| Check | Ready if | If not |
|---|---|---|
| Product codes | One code per sellable item, no duplicates | Clean-up before build, or the catalog will show the same item twice |
| Units and pack sizes | Each item has a sales unit and a minimum order quantity | Orders arrive in the wrong unit and get re-keyed |
| Prices per tier | Every item has a price for every tier, with a valid-from date | Gaps show as blank or zero prices to dealers |
| Stock | Available quantity per location, refreshed on a known schedule | Show "in stock / on request" rather than a number |
| Customer master | One account per company, with GSTIN and a credit limit | Duplicate accounts mean split order histories and wrong credit checks |
| Documents | Invoices and certificates retrievable by order or batch number | Files stay on email, and the portal cannot answer the question it exists for |
Every row that fails is work, whichever supplier you choose, and it is better found now than in week six of a build.
Step 2: write down the rules nobody has written down
A portal can only enforce rules that exist on paper. This is the step people skip, and it is where most of the cost hides.
On the supplier side
Decide what a supplier must provide before you will pay them, and how you will check it. In India that means capturing the legal name, PAN and GSTIN as data fields, checking the GSTIN against the official GST tool, comparing the registered name with the bank proof, and recording the Udyam details for micro and small suppliers. We list the whole set in the documents a supplier onboarding portal should collect.
Then decide how payment status will be handled, because small suppliers value it most. Under the MSMED Act the payment period for micro and small suppliers is tied to acceptance of the goods or services. The Development Commissioner (MSME) explains that where a written agreement exists, the agreed period cannot run past 45 days from acceptance, and that where nothing is agreed in writing there is a shorter default of fifteen days. A portal that records the acceptance date and the written term, and shows a due date on every invoice, makes the clock visible to your accounts team and to the supplier. That is a design aid; confirm how the rule applies to your agreements with an adviser.
On the dealer side
Write down your price tiers, your schemes with their dates and combination rules, and what happens when an order exceeds a dealer's credit. Dealer portals succeed or fail on those three. Group dealers into a few tiers rather than keeping a list per dealer. Decide in advance whether a credit overrun blocks the order or holds it for approval, and who approves. Our answer on dealer portal pricing, schemes and credit limits goes through each.
Territories belong here too. Decide whether they are exclusive before anyone opens the software; a portal can enforce a policy, but it cannot invent one.
Step 3: decide who sees what
A portal's value is that outsiders log in to your systems, and its biggest risk is the same fact. OWASP's Top 10 for 2025 lists Broken Access Control first, and describes it as users acting outside their intended permissions. The pattern in portals is easy to picture: one supplier opening another's purchase orders, one dealer seeing another's price list, a read-only user approving an invoice.
Settle the permission model on paper before screens are designed, and include the people who will use the portal away from a desk: a dealer's counter staff on a phone, a supplier's dispatch clerk uploading a delivery note from the warehouse floor. Their screens need the two or three actions they actually take, not the full desktop menu. Each supplier or dealer is its own company space. Each person has a role inside it. Access is denied unless a role allows it, ownership is checked on the server for every request including file downloads, and changes to prices, credit limits and bank details are logged. The roles and the tests are laid out in who should see what in a supplier or dealer portal. Put the test in your acceptance list: sign in as one dealer and try to open another's order.
Step 4: scope a small first release
Pick one relationship and one painful workflow. For dealers that might be reorders, order status and invoices for a single tier. For suppliers it might be purchase order confirmation and certificate upload for a pilot group. Everything else waits.
Cost and timeline follow from a short list of things: how many user types the portal serves, how deep the ERP integration goes (read-only is a much smaller job than two-way), how complex the pricing and approval rules are, how many document types it handles, and how much data has to be cleaned and loaded. What drives the cost and timeline of a B2B portal explains each and why a fixed figure before discovery is unreliable.
The GOV.UK Service Manual describes a useful rhythm: a discovery phase to learn what users need and what constraints exist, an alpha to test the riskiest idea cheaply, then a beta with real users before wider release. It suits a portal well, and it gives you something to measure: the share of orders placed or confirmed in the portal, and the number of status queries that stopped reaching your team. Accounts created is not a measure; it only says you sent invitations.
Step 5: write the brief and compare quotes fairly
Put the first four steps in a document: the users and what they do today by email and phone, each requirement marked must, should or later, the ERP items to be read and written, the roles, who owns the accounts, what support follows launch and which test scenarios must pass before each release is accepted. The B2B portal requirements checklist is written so you can copy it into your own document.
Send the same brief to every supplier and ask for answers in the same structure, with assumptions and exclusions stated. Whether you configure a platform or commission a custom software build, the same document lets you compare like with like, and it protects you if you later change supplier.
A scoring sheet for comparing proposals
Agree the weights before the proposals arrive, so the most polished demo does not set them for you. A starting point:
| Criterion | Weight | What earns full marks |
|---|---|---|
| Fit to your hardest real cases | 25 | Shown working on your data, not described |
| ERP integration plan | 20 | Names the items read and written, the refresh schedule and what happens when the link fails |
| Access control and logging | 15 | Explains company separation and offers the cross-account test as an acceptance item |
| First-release scope | 10 | Lists what is in, what is out, and the acceptance tests |
| Ownership and handover | 10 | Hosting, domain, repository and third-party accounts in your name; code and documentation handed over |
| Support after launch | 10 | Named response times, how updates are applied, who supports your dealers or suppliers |
| Total cost over three years | 10 | Build, licences or subscriptions, hosting and support, with exclusions stated |
Cost is scored, but not allowed to dominate: in a written brief, the price differences that matter usually show up as gaps in the other rows first.
Configure or build? A decision table you can fill in
Most manufacturers end up mixing the two: configure a platform for the standard parts and build only what makes the business different. The table below is a quick way to see where your requirements fall. Mark each row with the column that matches your situation, and treat the rows where you are not sure as open questions.
| Your situation | Configure a platform or ERP module | Build custom |
|---|---|---|
| Reorders from a fixed catalog at account price lists | Usually enough | Rarely worth it |
| Products configured to order (sized, built from options) | Often strains the product model | Worth considering |
| Pricing that depends on several factors at once | Check the rules engine on a real example first | Worth considering |
| Dealer territories, exclusivity or multi-step approvals | Limited to simple customer groups | Models your agreements exactly |
| Wanting to be live quickly with a small group | Faster to first use | Slower, unless the first release is kept narrow |
| Wanting few ongoing dependencies | You depend on the vendor's roadmap and pricing | You depend on whoever maintains the code, so insist on owning the accounts and code |
"Configure" is not free of build work: connecting an ERP, cleaning product data and setting up roles take effort whichever route you choose.
Fill the table in with your worst cases, not a demo
A demo shows the best case. To fill in the table for your business, write down the commercial rules that cause the most re-keying and argument today: a configured product with a contract price, a dealer order over its credit limit, a scheme that cannot combine with a tier discount, a parent company ordering for its branches, a supplier who may only see purchase orders for one plant. Ask each platform vendor to show each one working on your data during evaluation. Every rule that needs a workaround moves that row towards the build column; if most of them do, the platform is the wrong starting point.
Put the same cases to any custom developer. They should explain how each rule is modelled in the data, not only how it looks on screen.
A worked example
To make the steps concrete, imagine a hypothetical mid-sized maker of industrial fasteners that sells through a few dozen dealers and buys raw material and plating services from a handful of suppliers. Its sales desk spends the morning re-keying dealer emails into the ERP and the afternoon answering "has it shipped?" calls. Purchasing spends its week chasing material certificates and delivery dates.
Which portal first? The sales desk is the larger drain, so the dealer portal comes first and the supplier portal waits for the second release.
What does the ERP give? Price lists per dealer tier, available stock and invoice status can be read. Credit balance can only be read overnight, which becomes a design constraint: the portal will show it with an "as of" time instead of promising a live figure.
What rules were never written down? Dealers fall into three tiers, but two dealers have unwritten special prices on one product family. The company records them as dated overrides with an owner, and discovers one has silently expired.
Who sees what? Dealers see only their own prices, orders and invoices; the dealer's administrator manages their own staff; finance sees credit; sales support can view but not change dealer accounts.
What goes in the first release? Reorders from a saved list, order status and invoice download for one tier of dealers who volunteered. Schemes, returns and warranty claims are deliberately left for later.
How is it judged? Before launch the team counts a typical week of dealer emails and status calls. After six weeks it compares: how many reorders arrived through the portal, and how many status calls stopped. The numbers decide whether the second tier of dealers is invited, or whether something must be fixed first.
Questions to ask any portal supplier, and the answers to worry about
| Ask | A good answer | Pause if you hear |
|---|---|---|
| Who will own the hosting, domain, repository and third-party accounts? | Your company, from day one, with the supplier added as a user | "We transfer everything at the end" |
| How does the portal read prices, stock and credit from our ERP? | Names the items, the method and the refresh schedule, and what users see when the link fails | A demo built on sample data with no mention of your ERP |
| How are companies kept apart? | Ownership checked on the server for every record and file, with a cross-account test in acceptance | "Security is handled by the framework" |
| Which actions are logged, and who can see the log? | Price, credit-limit and bank-detail changes at minimum, visible to your admins | No log, or a log only the supplier can read |
| What is in the first release, and what is left out? | One user group, one workflow, a written exclusions list | Everything at once, or a fixed price before anyone asked how your pricing works |
| How do we roll it out? | A pilot group of willing partners, then the next tier | Every dealer and supplier on the same day |
| Who supports our users after launch, and how are updates applied? | Named response times and an update routine | No support plan |
| What does handover include? | Code, documentation and account access | Documentation "on request" |
One weak answer can have a reason behind it; ask for it. A pattern of them across ownership, integration and access control is the signal to keep looking.
Once the pilot works, retire the old email or phone route for that task. A portal that runs alongside the old route indefinitely never becomes the way the work is done.



